• Blog posts

    Bio

    By Miles Nicholson

    When you assign a cable within elecworks™, it will assume that any unconnected spare cores will be tied back. You can however reserve cores to be connected to other devices. Whilst it is unusual to split a cable between multiple devices, it can occur. This video shows you how you can reserve cable cores within a single line diagram in order that the spare cores can be connected to a different device.