You might wish to divide a project that contains hundreds of pages into smaller groups of drawings so the amount of data that the project manager must manage is trimmed to only the pages you need to modify. Each sub-project will have its own dedicated database which will only need to track changes to the limited number of drawings in the sub-project. Changes made to the sub-projects will automatically appear in the master project.