Question
How do I turn on the Project Base and Survey Points?
Answer
As default both the Project Base Point and Survey Points are visible in a view. To make them visible you need to turn them on in Visibility/Graphics.
Click View tab > Graphics panel > (Visibility/Graphics).
Select the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, click the + to expand the list.
To display Project Base Point and Survey Points click on the tick next to the headings. Then press OK.
Comments
0 comments
Please sign in to leave a comment.